Canadian Blood Services Brampton Office Recommissioning

A not-for-profit’s retrofit results in big energy and dollar savings

Brampton, Ontario
 
Sectors
Services
Architect
Perkins & Will

Hired to check the systems and equipment in Canadian Blood Services’ Brampton office against the original design, Stantec’s recommissioning team found that the building’s original specifications no longer applied. The process resulted in recommendations for capital improvements, but its primary focus was to optimize the building systems via tune-up activities, improved operation and maintenance (O&M), and diagnostic testing.

Through a building optimization program, Stantec’s engineers were able to cut electricity and natural gas usage by almost 50,000 kwh and more than 240,000 cubic metres, respectively – saving the not-for-profit almost $80,000 through repairs that would be paid back in less than two years.

View A Project Near You

Find Stantec projects near you
End of main content To top