Skip to main content
skip to content Français Search
Start of main content
Nickel Rim South

EPCM services for GlencoreXstrata at Nickel Rim South

Sudbury, Ontario

Stantec became a part of the Nickel Rim South project in 2003. Alongside Xstrata Nickel (now GlencoreXstrata) employees, we were responsible for coordinating conceptual, scoping, prefeasibility, and feasibility studies. As a result of the study findings, a Deposit Definition phase was authorized for Nickel Rim South in 2004. A contract was also awarded to us for the detailed engineering of the underground infrastructure, including ventilation, ore and waste handling; mine dewatering, and underground mine facilities and services. At the detailed design phase, we were also involved in the full mine design, with ongoing support provided to the automation and controls group, as well as focused efforts on hoisting/headworks.

Ten years later, we’re still on site, providing on-site support to operations.

View A Project Near You

Find Stantec projects near you
End of main content To top