Skip to main content
skip to content Français Search
Start of main content
Confidential Client – Clinical Scale Solid Dosage Manufacturing Facility

A dose of flexibility

Confidential

Our client needed a new solid dosage manufacturing  facility for clinical supplies. After we conducted a feasibility study, we settled on an existing warehouse as top location. The site was a 30,000 square foot good manufacturing practice warehouse—and we needed to fit processing suites and offices in, while adhering to the owner’s OEB 4 guidelines.

The main floor of the warehouse was converted into 11 processing suites. The suites were constructed and configured with an eye to flexible manufacturing, allowing for multiple pieces of equipment and multiple unit operations in each space. The processing equipment was retrofitted to handle high-potency compounds, minimizing human exposure and contact. And on the second floor, office space accommodates nearly 200 employees. 

View A Project Near You

Find Stantec projects near you
End of main content To top