Dixie Recovery Plan Power Project

Power tapping, a geothermal addition

Nevada
 
Sectors

Three hours east of Reno, Nevada is the state’s largest geothermal power generation facility—the Dixie Valley Geothermal Power Plant—producing more than 67 MW.

Stantec was involved in the original plant design in 1988, and with more than 30 years of geothermal industry experience, we were selected by Terra-Gen Power, LLC to design a plant addition.

This augmentation featured two of our proprietary geothermal brine separators—a design that we created to meet the difficulties of separating geothermal resources. These designs helped to provide steam for an additional 4 MW of clean, low-cost, renewable power to Southern California Edison, permitting California to meet the 33 percent renewable portfolio standard.