Skip to main content
skip to content Français Search
Start of main content
Enbridge Energy Southern Access Pipeline

Measuring the effects of an underground pipeline on our wetlands and waterways.

Wisconsin

Stantec conducted three years of post-construction monitoring of wetlands and waterways along an extensive pipeline corridor to evaluate compliance with ACOE and WDNR permit conditions. Stantec's activities included floristic surveys, soils evaluations, comparison of pre and post-construction wetland boundaries and documentation of observations regarding erosion, subsidence and potential hydrology alterations. Stantec’s environmental scientists prepared for the client annual reports summarizing methods and results of the monitoring and recommendations for future monitoring. In addition, weekly erosion control monitoring was conducted as required in WDNR permits.

Our Madison office protects our natural resources while serving the needs of the oil and gas industry. By performing these services, we are ensuring the continued health and stability of our natural environments for recently constructed pipeline corridors.

 

View A Project Near You

Find Stantec projects near you
End of main content To top