Skip to main content
skip to content Français Search
Start of main content
YMCA

Promoting positive change in the community

East Goshen
 
Services
Architect
Bernardon Haber Holloway Architects

Our engineers worked closely with the Township to overcome a few challenges for the proposed 80,000 square foot building with 341-space parking area.

Due to the site's close proximity to a high-quality stream, extra precautions were taken with the design of the storm water detention system and the erosion and sediment control measures. Existing soils needed to be excavated and properly disposed of and fills from another site were brought in to the YMCA site. The Township's restriction on tree removal also presented a design challenge for the parking lot, as the site was wooded. The parking lot was designed to reduce to the greatest extent possible the number of trees that would need to be removed.

Our team also provided the necessary coordination amongst the client, the East Goshen Township, PENNDOT, and the PADEP to obtain the required approvals and permits to allow for the site development.

View A Project Near You

Find Stantec projects near you
End of main content To top