From communities North of 60 to growing urban centres, our bridge team is helping clients deliver the next generation of short- and medium-span bridges.
At SMSB, our presentations cover rehabilitation, rapid replacement, active transportation, and engineered timber. We’re sharing ideas to extend the life, performance, and sustainability of critical transportation infrastructure.
Check out our presentations listed below.
" }Wednesday, August 5
2:50–3:10 PM: Six Mile Pedestrian Overpass 03003 Rehabilitation Design
Presenter: Jingjing Li
4:00–4:20 PM: HWY 417 Overpass at Preston Street Rapid Bridge Replacement: Challenges and Lessons Learned
Presenter: Mohamed Zawam
4:20–4:40 PM: Ahbau Creek Howe Truss Bridge Rehabilitation: Timber Preservation Over Replacement
Co-Presenter: Aareez Qadri
4:20– 4:40 PM: Interim Rehabilitation and Long-Term Structural Realignment Strategy for Toronto’s Gardiner Expressway East
Presenter: Jeffrey Ma
Thursday, August 6
2:50–3:10 PM: Galloping Goose Active Transportation Trail—Two Pedestrian Bridges
Presenter: Keith Kirkwood and Aareez Qadri
4:00–4:20 PM: F.G. Gardiner Expressway: Section 2 Rehabilitation Project
Presenter: Srdjan Brasic
4:40–5:00 PM: Study on Differential Cambers of Side-by-Side Precast Concrete Box Girders: Design Optimization and Construction Verification
Presentes: Han Choi
Friday, August 7
11:40–12:00 PM: Multi-Use Trail Retrofit Design—Eastern Avenue Bridge in Toronto
Presenter: Morgan Herrell
11:40–12:00 PM: Twinning of Stoney Trail over the Bow River in NW Calgary
Presenter: Andrew Boucher
11:40–12:00 PM: Design of Glen Road Pedestrian Bridge Over Rosedale Valley
Presenter: Jeffrey Ma
2:30–2:50 PM: Highway 417 Bridge Replacements—Reuse of Existing Piles
Presenter: Nathan Bakker
4:00–4:20 PM: Falls Creek Bridge: Design for a Mountainous Site Washed Out by Atmospheric River
Presenter: John Philp
4:00–4:20 PM: An Engineered Timber Bridge for the First Nations
Presenter: Vanessa Wan