Skip to main content
Start of main content

Circle Drive South Owner’s Engineer

Largest infrastructure project in the city’s history

  • $300M

    Construction Value

  • 10KM

    Feeway

  • 5

    Interchanges

  • Saskatoon, Saskatchewan

    Saskatoon, Saskatchewan

Providing a direct link between east and west Saskatoon

When undertaking Circle Drive South, the largest infrastructure project in the City of Saskatoon history, they looked to us. The City’s first design-build procurement required 10 kilometers of freeway, five interchanges, three railway grade separations and a new crossing over the South Saskatchewan River.

As the owner’s engineer for the city, we’ve been there from the beginning nearly a decade ago, providing complete pre-design through post-construction phase services for the $300 million project.

Before designs could be mapped out we completed the Circle Drive South functional planning study. The studies recommendations and technical requirements were used for this project.

The opening of Circle Drive South has provided a more direct link between the east and west sides of the river preventing motorists from being funneled through the downtown core. Initial traffic projections suggest up to a 30 percent decrease in the average annual daily traffic using the Sid Buckwold Bridge in downtown Saskatoon.

At a Glance

Offices

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top