Clover Bar Landfill Gas Plant

Converting solid waste to biofuels

  • Edmonton, Alberta

    Edmonton, Alberta

This landfill can help power thousands of homes while reducing methane emissions

The Edmonton Waste Management Centre’s landfill gas collecting plant, Clover Bar, had an opportunity to become North America’s first industrial-scale facility producing biofuels from municipal solid waste. But to do that, they had to modify the existing facility and add three reciprocating engines plus associated generators. Our job? Engineering design and project management.

Our team was responsible for the technical direction and applicable standards conformance. We sourced design efforts to meet the schedule, completed the financial and schedule reporting, and led the tender, evaluation, and recommendation for the supply of power equipment and construction labor. The work included the engineering and design of gas compressors/blowers and demolition of the existing electrical instrument and control systems. With programmable logic controllers and graphical interfaces, we improved the functionality and safety of the plant.

The result? Enough energy to power approximately 4,600 Edmonton homes every year.

At a Glance

Offices

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top