Skip to main content
Start of main content

Restigouche Mine Care and Maintenance Phase

Mine site management to protect our communities

  • 25

    Years On Site

  • 500M

    Runoff Liters/Year

  • New Brunswick

    New Brunswick

Reclaiming a mine to stabilize it for both the long and short term

The province of New Brunswick assumed environmental and public safety responsibilities in 2009 for the former Restigouche lead and zinc mine. Since then, we’ve been involved in daily environmental monitoring of the mine and are implementing reclamation activities.  We revisited the original reclamation approach and evaluated several alternate closure approaches to find the best option to reduce closure costs and site liability. The goal is to reclaim the site so it’s physically and chemically stable for both the short and long term.

One of the greatest liabilities of former mines can be acid mine drainage, which if not treated and contained can pollute nearby water sources and harm aquatic ecosystems and plant life. As part of the progressive reclamation process, we designed and managed a sludge relocation project, and managed the movement of acid generating waste rock to the open pit to eliminate acid generation. We also manage a yearly dewatering campaign to treat acid runoff from the site.  For all these projects, we provided inspection and design services, materials testing and reporting, supervision of construction, and final construction reports.

At a Glance

Offices

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top