Expanding and upgrading North Kildare’s sewerage system

At a Glance

  • €38M

    Construction Value

Location
North Kildare, Ireland
Offices
Client
  • Coffey

Upper Liffey Valley Sewerage Scheme

The Upper Liffey Valley Regional Sewerage Scheme focused on an expansion and upgrade of the system. It serves several towns in North Kildare including Naas, Newbridge, Sallins, Clane, and Kill and connects the wastewater collection network to a regional wastewater treatment plant at Osberstown in Naas.

The main contractor, Coffey, engaged our team to provide detailed engineering design services for the wastewater network encompassing gravity sewers, rising mains, and new wastewater pumping stations. We also acted as project supervisor for the design process (PSDP) for the detailed design and construction stage of the project.

The scheme extended across three separate collection network catchments in north Kildare and included the upgrade of an existing wastewater pumping station at Sallins along with the construction of two new wastewater pumping stations on existing sites at Clane and Monread. We designed pumping stations at Clane and Monread to meet the requirements of the planning authority, with a natural stone finish to the curved façade at both sites. The project also included the construction of approximately 9 kilometres (5.5 miles) of rising mains and 10 kilometres (6.2 miles) of gravity sewers, with a significant element of the works through the busy trafficked areas of Naas, Newbridge, Sallins, and Clane. The rising main and gravity sewer sections involved trenchless crossings of the M7 motorway, the Grand Canal and the River Liffey.

The completed scheme provides a collection network in line with modern practices and compliant with current environmental legislation and sustainability principles.

At a Glance

  • €38M

    Construction Value

Location
North Kildare, Ireland
Offices
Client
  • Coffey

Meet Our Team

James Durkan, Associate Director

Our success comes from building relationships and providing design solutions that are shaped through collaboration and community insight.

Danny Bourke, Director, Water

I drive efficient delivery through a fusion of data analytics, engineering understanding, and a commitment to design excellence.

Jim Dickson, Associate

I champion equipment choices that meet performance demands, cut costs, and drive the most sustainable results.

James Durkan

Associate Director

Danny Bourke

Director, Water

Jim Dickson

Associate

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top