Supporting clean energy production in Peru

At a Glance

  • 98.5

    MW Generated

  • 2.7

    km Steel Penstock

Location
Lima, Peru
Offices
Client
  • Buenaventura

Huanza Hydropower Plant

Peruvian mining company Buenaventura needed to increase the reliability of electric power for their operations. They also wanted to increase the available clean electricity supply for Peru—particularly in the south—by harnessing renewable hydropower and leveraging existing water conveyance infrastructure. They selected the Pallca River Basin in Santa Eulalia, approximately 130 kilometres (81 miles) east of the capital city of Lima for the site of the Huanza Hydropower Plant.

Buenaventura engaged our team to provide design, technical specifications and drawings, bid documents, quality assurance during construction, and supervision through commissioning for this project. Key components of this project included a regulation dam and intake on the Pallaca River, a nearly 10-kilometre (6.2-mile) headrace tunnel, a 2.3-kilometre (1.4-mile) steel penstock to control and direct the flow of water, a surface powerhouse with Pelton units, and grid interconnection at 220 kilovolts. Additionally, a low diversion dam captures flow from the Conay River, which is then conveyed through a PVC pipeline and discharged into the hydropower plant surge chamber.

With an installed capacity of 90.6-megawatts, the plant delivers safe, efficient generation in extremely steep, high‑altitude terrain. It also integrates multiple water sources into a high‑head, run‑of‑river facility with daily regulation that doesn’t compromise performance or environmental outcomes.

At a Glance

  • 98.5

    MW Generated

  • 2.7

    km Steel Penstock

Location
Lima, Peru
Offices
Client
  • Buenaventura

Meet Our Team

Roy Abarca, Power & Dams Manager

My work philosophy is to look for solutions that combine pragmatism and creativity—I’m always focused on meeting the needs of our clients.

Carlos Calderaro, Energy Sector Leader, Latin America

I constantly focus on expanding our team interactions and dynamics to provide the best hydropower energy solutions around the globe.

Roy Abarca

Power & Dams Manager

Carlos Calderaro

Energy Sector Leader, Latin America

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top