A30 Improvements

We designed a 22m high reinforced soil slope as value engineering exercise to eliminate the need for an expensive viaduct

  • Cornwall, United Kingdom

    Cornwall, United Kingdom

Our work on a high embankment, rather than a viaduct, helped save millions of pounds

When the Highways Agency needed to improve an 11.5-kilometre segment of the A30, Cornwall’s main road link to the rest of the UK, we were brought in to provide detailed design. The project area is at the head of the Camel Valley, a recognised area of high ecological sensitivity. That meant, to protect the local ecology, the road had to cross the valley around 20 metres above the valley floor. The solution? A high embankment.

In the preliminary design phase, the option of strengthened earthwork—using geogrid reinforcement and incorporating imported selected granular fill—was tackled by our partners. In addition, the complex shape of the embankment, with sweeping curves along its width, gave us a particular challenge. Our design used a technique of wrapping the geogrid back over the top of the lift of compacted fill which was then buried by the next lift.

The final structure, at 22 metres high, uses one of the highest reinforced slopes in the UK. With its stream culvert, wildlife underpass, and height from the valley floor, the new A30 embankment keeps Cornwall connected and doesn’t encroach on protected natural habitats.

At a Glance

Offices
Client
  • Scott Wilson and McAplines

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top