Diversifying energy sources to help this system go the extra mile

Location
California
Offices

2 MW ECM Battery Storage Design Build

The EMC 13 project entailed 2 MW (4 MWh) of battery energy storage (2 x 1 MW systems), designed for demand management applications. Both systems included solar photovoltaic (PV) system installations that were designed to produce excess power for storage in the batteries. Both systems were also designed to include islanding capability to support some of the critical functions on each base. We prepared design-build bridging documents for these projects. 