Our team weighed the options and determined that the 'simple' approach would work best

The Bayonne Cogeneration Plant is a nominal 170 MW gas fired 3 X 1 combined cycle cogeneration plant originally builit in 1988. Stantec assisted in the evaluation and design development of an expansion project.

Stantec’s initial study evaluated the installation of two options: a combined cycle power plant utilizing a GE Frame 6B CTG or a simple cycle plant utilizing a GE LM6000 CTG with SCR.

This study involved the development of capital cost estimates and layouts for each alternative. The result of this study led to the decision to install the simple cycle plant. To support the plant permitting efforts for the simple cycle plant, Stantec provide the following engineering and design services: development of general arrangement drawings, conceptual foundation review, development of piping and electrical tie-in details, and electrical engineering in support of electrical interconnection with PJM specificaiton of major equipment including a gas compressor and a selective catalytic reduction system. 

At a Glance

Offices
Meet Our Team

Lance Boire, Senior Associate, Power

Lead from where you are at, no matter what position or role you’re in. Take pride and ownership in what you’re doing each day.
Lance Boire Senior Associate, Power Read More

Terri Poussard, Director of Project Development, Power

My goal is to help our clients bring power from concept to reality and turn each project into a success story.
Terri Poussard Director of Project Development, Power Read More

Kenny Rogers, Vice President, Power

We have the opportunity to be creative while contributing to the community through our work, generating new jobs and cleaner, more efficient electricity.
Kenny Rogers Vice President, Power Read More

Steve Patry, Senior Associate

The most rewarding aspect of my career is working with our team of engineers and designers to develop solutions to challenging problems that benefit our clients and communities.

Jim Stone, Principal

A good project always starts with great people; Stantec’s power team includes some of the best in the industry.
  • Lance Boire

    Senior Associate, Power

  • Terri Poussard

    Director of Project Development, Power

  • Kenny Rogers

    Vice President, Power

  • Steve Patry

    Senior Associate

  • Jim Stone

    Principal

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content To top