Designed to advance next-generation semiconductor manufacturing, this 6 million-square-foot (557,000-square-metre) facility includes more than 1.2 million square feet (111,000 square metres) of Class 1000 fabrication, clean sub fab, and facility sub fab space.
We provided integrated architecture and engineering services across structural, mechanical, process, electrical, and instrumentation disciplines, while supporting permitting, client coordination, and construction administration. Within the development, the 4.8 million-square-foot (446,000-square-metre) fit-up integrates sophisticated cleanroom, gas and chemical, bulk specialty gas, and warehouse infrastructure to support high-performance manufacturing operations.
Ultimately, this project shows what integrated delivery makes possible: highly specialized production environments and supporting infrastructure can be brought together as a cohesive whole. Close alignment between design, manufacturing needs, regulatory requirements, and field execution throughout the program turned that complexity into a facility built to support next-generation semiconductor manufacturing.
" }