Stantec was responsible for design plans and environmental studies for the Eighth Street viaduct reconstruction project. Eighth Street is a major east-west collector that connects downtown Cincinnati with the west side of the city. Where Eighth Street crosses the project site, it consists of four traffic lanes, two bike lanes and two sidewalks. The Burns Street ramp provides access from Eighth and Burns Streets to Evans Street below the viaduct.

The project involved three structures: the Eighth Street viaduct, the Eighth Street bridge, and the Burns Street ramp. All three structures were constructed in 1929; the viaduct was last rehabilitated in 1974. 80 years of salt laden water draining through the viaduct’s intermediate expansion joints led to severe deterioration of the expansion piers below, requiring the installation of emergency shoring around three piers while the plans for the rehab project were developed. The Eighth Street bridge and Burns Street ramp bridge replacements were logical additions to the project since the viaduct had to be closed to replace the expansion piers.

Meet Our Team

Michael Sturdevant, Associate

It’s important not to rush through your design. I make sure to look at everything thoroughly and double check the details.

Michael Sturdevant

Associate

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top