Skip to main content
Start of main content

Miraloma Recharge Basin

A vital addition to the community

  • 13

    Acre Site

  • 6K

    Acre-Feet of Water

  • Anaheim, California

    Anaheim, California

Balancing cost savings and functionality through reduced pipeline lengths and a sustainable basin configuration

When the Orange County Water District (OCWD) identified the need for a new percolation basin, they enlisted our expertise. Built on a 13-acre site in Anaheim, the Miraloma Basin is a vital addition to OCWD’s groundwater management system that allows the percolation of up to an additional 6,000 acre-feet of water — enough for 50,000 people. Prior to construction, thousands of acre‐feet of water were lost every year due to insufficient recharge capacity in the region.

Our engineering and construction support services included preparing a preliminary design report and plans, specifications, and estimates. The selected alternative provides a balance of cost savings and functionality through reduced pipeline lengths and a basin configuration that allows for a future lowering of the basin floor.

This facility is devoted to water from the groundwater replenishment system, the world’s largest advanced wastewater purification system for indirect potable reuse. Although only recently put into service, the basin yields the highest measured percolation rates among OCWD’s 21 basins due to favorable geology and ultra-pure GWRS water.

At a Glance

Offices
Client
  • Orange County Water District

Services


Markets


We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top