U-6084 Riverbend Continuous Flow Intersection

Alternative roadway and traffic engineering

  • 0.632

    Miles

  • $7.4M

    Construction Value

  • Charlotte, North Carolina

    Charlotte, North Carolina

This is North Carolina’s first constructed continuous flow intersection.

In 2016, Corning Optical announced it would move its headquarters to Riverbend Village in Charlotte, North Carolina. A traffic impact analysis was submitted to the North Carolina Department of Transportation (NCDOT) recommending a continuous flow intersection (CFI) to address the area’s growth.

We partnered with Simpson Commercial Real Estate, the City of Charlotte Department of Transportation (CDOT), and NCDOT to design North Carolina’s first CFI at the intersection of NC 16 (Brookshire Boulevard) and Mt. Holly-Huntersville Road. For roadway design, we focused on designing the auxiliary through, offset left, and bypass right lanes, as well as pedestrian movements with minimal right-of-way and utility impacts. When it came to traffic engineering, we focused on transportation management, signing and delineation, signal design, and how to maintain safe pedestrian accommodations during construction and final design. We also evaluated the existing site plan’s environmental permit, coordinating directly with the US Army Corps of Engineers to develop the best possible permit solution for the CFI and site.

In Fall 2020, this intersection was recognized by the American Council of Engineering Companies of North Carolina (ACEC/NC) with The Grand Conceptor award—the top prize—as part of the annual Engineering Excellence Awards.

Meet Our Team

Dean Sarvis, Senior Transportation Engineer

Expect change and you won’t be disappointed later.
Dean Sarvis Senior Transportation Engineer Read More

Betsy Watson, Senior Principal

The great thing about Stantec is everyone has an opportunity to be part of the solution—from project issues to internal discussions, we can all make a difference.

Cindy Hall, Senior Associate

I enjoy my job because I see the results of our solutions around the community; improving traffic flow and roadway safety improves lives.

Larry Overn, Senior Associate

I like to make operational improvements that have an immediate impact for the commuting public.

Amber Coleman, Associate, Water

Everything we do as scientists is based on methodological evaluation and the ability to convey those findings to others.

Dean Sarvis

Senior Transportation Engineer

Betsy Watson

Senior Principal

Cindy Hall

Senior Associate

Larry Overn

Senior Associate

Amber Coleman

Associate, Water

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top