Skip to main content
Start of main content
Search Form Close Button

2671 - 2680 of 4926 results

Filter By

Showing 2671 - 2680 of 4926 results

  • Metropolitan Hospital FEMA Flood Resiliency
    Project

    Metropolitan Hospital FEMA Flood Resiliency

    Stantec is working with Metropolitan Hospital to introduce a place-focused resiliency project on New York City’s East River. This flood protection barrier protects against future storms and sea level rise while introducing an asset for the community.

    • Location:
      • New York, NY
    • Services:
      • Architecture
      • Assessment & Permitting
      • Civil Engineering
      • Landscape Architecture
      • Resilient Adaptation & Mitigation
    • Markets:
      • Buildings
      • Coastal Flood Risk Reduction & Restoration
      • Health
    Project
  • Metropolitan’s Pure Water Southern California
    Project

    Metropolitan’s Pure Water Southern California

    We support projects for Metropolitan’s Pure Water, one of the largest wastewater recycling programs in the world. The projects could supply clean, safe water to up to 15 million people in Southern California.

    • Location:
      • Carson, California Los Angeles, California
    • Markets:
      • Wastewater Treatment
      • Water
      • Water Reuse
    Project
  • Miami Beach Sea Level Rise Program
    Project

    Miami Beach Sea Level Rise Program

    Following a study that examined the effects of seawater rise on their infrastructure, the City of Miami Beach set out to design improvements that would prioritize flood risk management, essential services, and public safety. We were there to help.

    • Location:
      • Miami Beach, Florida
    • Services:
      • Assessment & Permitting
      • Resilient Adaptation & Mitigation
      • Water Resources
    • Markets:
      • Wet Weather Flow & Urban Stormwater
    Project
  • Michael M. Boone Elementary School
    Project

    Michael M. Boone Elementary School

    As part of the most ambitious bond program in the history of Highland Park ISD, three elementary schools were replaced by new facilities. Boone Elementary was built first, and our team provided architecture and integrated building services.

    • Location:
      • Dallas, Texas
    • Services:
      • Architecture
      • Buildings Engineering
      • Electrical Engineering
      • Information & Communications Technology
      • Interior Design
      • Lighting Design
      • Mechanical Engineering
      • Structural Engineering
      • Sustainability & Building Performance
    • Markets:
      • Education
      • Elementary Schools
      • PreK-12
    Project
  • Michigan Automated Grocery Delivery Pilot
    Project

    Michigan Automated Grocery Delivery Pilot

    Funded through a Michigan Mobility Funding Platform grant, this project will address existing transportation challenges, alleviate mobility barriers, and reduce the impact of “food deserts” on communities.

    • Location:
      • Troy, Michigan
    • Services:
      • Transportation Planning
    • Markets:
      • Retail Stores
      • Smart(ER) Mobility
      • Urban Mobility
    Project
  • Michigan State University - Akers Hall Dining and Residence Renovation
    Project

    Michigan State University - Akers Hall Dining and Residence Renovation

    We helped Michigan State University renovate and modernize their Akers Hall dining center and residence halls.

    • Location:
      • East Lansing, Michigan East Lansing, Michigan
    • Services:
      • Architecture
      • Electrical Engineering
      • Mechanical Engineering
      • Structural Engineering
    • Markets:
      • Education
      • Student Life
    Project
  • Michigan State University - Brody Housing
    Project

    Michigan State University - Brody Housing

    The Brody Neighborhood is the first full renovation of a campus residential neighborhood using the vision outlined in the university’s future state strategic plan.

    • Location:
      • East Lansing, Michigan East Lansing, Michigan
    • Services:
      • Architecture
      • Electrical Engineering
      • Mechanical Engineering
      • Structural Engineering
    • Markets:
      • Education
      • Higher Education
      • Student Life
    Project
  • Microbial Characterization in a School Setting
    Project

    Microbial Characterization in a School Setting

    Stantec conducted an exposure assessment to active ingredients in various disinfectant solutions used in K-8 classrooms—results of a microbial bioburden investigation helped a client understand the effectiveness of their spray disinfection solution.

    • Location:
      • United States
    • Services:
      • Exposure Sciences
      • Health Sciences Advisory
      • Occupational Health & Safety
    • Markets:
      • Environment
    Project
  • Microplastics Watershed Scale Environmental Fate Model
    Project

    Microplastics Watershed Scale Environmental Fate Model

    European Tyre and Rubber Manufacturers’ Association (ETMRA) reached out to Stantec Health Sciences Advisory scientists to conceive, manage, and provide technical oversight in evaluating the freshwater fate and transport of microplastics.

    • Location:
      • Netherlands
    • Services:
      • Computational Sciences
      • Exposure Sciences
      • Health Sciences Advisory
    • Markets:
      • Environment
    Project
  • Microsoft Building 83
    Project

    Microsoft Building 83

    Microsoft Building 83 set a new standard of design that continues to help with the collaborative process for staff in Redmond, Washington.

    • Location:
      • Redmond, Washington Redmond, Washington
    • Services:
      • Acoustics & Vibration
      • Buildings Engineering
      • Lighting Design
    • Markets:
      • Workplace & Office
    Project
End of main content
To top