Protea by PresCare
Our electrical, fire engineering and vertical transportation consultants integrated designs to realise operational efficiencies over the longer term for a leading aged care provider in Townsville.
3391 - 3400 of 4930 results
Showing 3391 - 3400 of 4930 results
Our electrical, fire engineering and vertical transportation consultants integrated designs to realise operational efficiencies over the longer term for a leading aged care provider in Townsville.
When the City of Rochester was looking for ways to increase forms of mobility that reduce dependency on cars, they looked to our team for help. The solution? Protected bike lanes.
Proto, a 22-story mixed-use residential tower in the Kendall Square neighborhood of Cambridge, was designed for graduate students and millennial STEM workers looking for modern, efficient apartment living with easy access to work.
Proton Energy Technologies Ltd. proposes hydrogen as an alternative solution to oil and gas by using existing oil fields and reforming the remaining fuel reservoirs, reducing carbon dioxide emissions, and limiting the need for the use of fresh water.
For this project, we designed a new proton therapy center for the University of Alabama at Birmingham (UAB). Our goal? To create a healing environment that puts the patient first.
The Providence Landfill Gas to Energy project is one of the largest landfill gas power plants in the United States. Using state-of-the-art technology, the plant captures and conditions the landfill gas.
We provided mechanical, electrical, and hydraulic engineering services for the Proximity Hamilton at Brisbane’s Portside Wharf. Features like air conditioning and car park exhaust maintain appeal and comfort at the residential waterfront development.
Stantec’s multidisciplinary team provided civil, planning, urban design, traffic, site electrical, archeology, geotechnical, landscape architecture, environmental, and project management services to bring this mixed-use development to life.
Stantec partnered with a utility’s business continuity and emergency management and wildfire operations teams to explore scenarios spanning all phases of their public safety power shutoff (PSPS) plan.
Stantec helped design this five-storey office building addition to strengthen Public Safety Canada’s presence in Ottawa.