Stonington South Pier and Inner Breakwater Renovation
For this project, our team conducted underwater and above water inspections and multibeam bathymetric surveys to ascertain the condition of Stonington’s 180-year-old stone South Pier.
4001 - 4010 of 4914 results
Showing 4001 - 4010 of 4914 results
For this project, our team conducted underwater and above water inspections and multibeam bathymetric surveys to ascertain the condition of Stonington’s 180-year-old stone South Pier.
The Charleston County Park and Recreation Commission (CCPRC) engaged Stantec to provide park planning, landscape architecture, and civil engineering for the development of a park master plan and subsequent design and construction documents.
Through collaboration with Stony Brook Medicine our team is designing a promising future in healthcare for cancer patient treatment.
We provided invasive species mitigation and planting services for a study exploring ecologically friendly solutions to excess nutrients from runoff in stormwater ponds.
As part of the Metrolinx expansion of the Stouffville rail corridor service in Ontario, Stantec provided overall program and project management for the upgrades and designed connections along the line and eight grade-separated crossings.
For this project, Stantec provided the civil design to provide safe parking and traveler access to the modernized main building and pavilion shelters at the Straight River rest area on the I-35 in Steele County, Minnesota.
Stantec provided geotechnical services to support feasibility studies for installing power cables across the strait, linking the island of Newfoundland to Labrador.
Facing a new health-based limit for manganese in water, the Region of Waterloo engaged our team to provide detailed design, site inspection, and construction administration for a new greensand plant.
Our team was engaged to provide architecture, structural engineering, and landscape architecture for the Strata Wynwood, a mixed-use development incorporating hundreds of residential units, retail, artist studios, and office space.
Working with the South East of Scotland Transport Partnership (SEStran), we conducted a desktop survey, stakeholder consultation, and site audits to develop new and upgrade existing cycle infrastructure.