CSO 012 Sustainable Infrastructure Improvements and Sewer Separation
As part of the community’s revised wet-weather improvement plan strategy, Stantec designed and implemented sewer separation solutions.
- Email: askstantec@stantec.com
701 - 710 of 4862 results
Showing 701 - 710 of 4862 results
As part of the community’s revised wet-weather improvement plan strategy, Stantec designed and implemented sewer separation solutions.
We helped Great River Energy determine the best way to upgrade their aging power transmission systems then helped them implement the ideal solution in a tight construction timeframe.
Working with Peddle Thorp, we developed a new 32-bed inpatient ward on the third level of the main hospital building for Brisbane’s Metro North Hospital and Health Service.
The Moreton Bay Regional Council engaged Stantec as part of the team to provide transportation advisory and planning services to help develop a master plan for major improvements to the Caboolture River Road east-west transportation corridor.
Parks Canada engaged Stantec to perform a slope stability and rockfall hazard assessment and develop remedial options along the highway from French Mountain to MacKenzie Mountain in Cape Breton Highlands National Park.
Cairngorms National Park Authority (CNPA) reached out to Stantec to study options to increase the park’s capacity for more sustainable ways of moving around including encouraging use of active travel options in the area around Aviemore.
Stantec provided building services design for a new mental health unit at Cairns Hospital, which blends therapeutic design with medical functionality to provide a calming and supportive environment.
Stantec provided civil engineering sketches as well as geotechnical support as part of a major redevelopment that replaces an aging theater. With more floor space, the Cairns Performing Arts Centre addresses diverse community and professional needs.
Stantec is supporting the Calaveras Transit Agency by developing a study and providing a Zero Emission Bus Rollout Plan for fixed-route revenue fleet conversion by 2040—examining the capital and operating costs of new battery electric bus technology.
Stantec worked with the developer of Calderwood Valley to deliver a master-planned community. We delivered engineering designs that included a water cycle management study, water-sensitive urban design strategy, and floodplain risk management study.