DIRFT III A5 Weir Works
We worked with Prologis UK Ltd to design a culvert and flood protections that would improve motorist safety on the A5 and at the Daventry International Rail Freight Termianl (DIRFT).
1491 - 1500 of 2503 results
Showing 1491 - 1500 of 2503 results
We worked with Prologis UK Ltd to design a culvert and flood protections that would improve motorist safety on the A5 and at the Daventry International Rail Freight Termianl (DIRFT).
We provided engineering and sustainability services to support the development of both the Leeds and Manchester hotels on their respective brownfield, city centre sites.
Our civil engineering services helped our client expand facilities hosting Europe’s largest data centre cluster.
Stantec was appointed to provide the structural and civil engineering design for David Russell Hall. The result? A single-storey, steel-framed, masonry-clad building.
Upon completion, this project will free up space on existing lines, provide for new local train services, passengers and freight, and ease congestion and over-crowding.
Learn how Stantec helped Yorkshire Water create and implement a sustainable drainage system for exceedance management to protect the local community against flooding during heavy rainfall.
Providing technical and community engagement support to help our client gain permission to build one of the UK’s largest solar energy parks at the former Royal Air Force Desborough airfield in Northamptonshire.
We helped conduct a satellite imagery evaluation and site survey research project that measured the eelgrass coverage across 260 kilometres of coastline in the Canadian Arctic.
Due to the infrastructure investment at Old Oak Common, we performed a study that aims to help London seize a major growth opportunity.
For this project, we provided detailed design, construction drawings and associated site support, including the production of on-site highways, off-site highways and foul and surface water drainage designs.