Corran Ferry Options Appraisal and Fixed Link Study
The Corran Ferry service faces several issues that impact its long-term sustainability—we were appointed to determine what the service should look like in the future and how it should be provided.
1521 - 1530 of 2525 results
Showing 1521 - 1530 of 2525 results
The Corran Ferry service faces several issues that impact its long-term sustainability—we were appointed to determine what the service should look like in the future and how it should be provided.
We provided structural and civil engineering and transport assessment services to Wiltshire Council to help deliver the transformation and redevelopment of the historic Grade II listed Corsham Mansion House.
The RSPCA appointed us to deliver structural, civil, and infrastructure engineering design along with site investigations and geotechnical engineering support for a new rehoming centre.
Our team delivered the detailed design for Cotton Field Wharf, including the remediation strategy, ground engineering design, and materials management plan, as well as structural and civil engineering.
We used DebrisFlow Predictor to estimate the extent of debris flow hazard to residents and properties along the North Shore of Cowichan Lake. After modeling over 70,000 flows, our team was able to define a credible runout limit of related hazards.
Working with marine infrastructure partners, our team was appointed to undertake an options appraisal for the future of the Craignure ferry terminal.
Crawley boasts the first CambiTHP B6 system installed in the United Kingdom. Deploying a design for manufacture and assembly (DfMA) fabrication mentality shortened construction timeframes and lowered overall capex.
We’re helping the University of Strathclyde redesign a city centre area to improve sustainable travel. With designs that remove barriers, improve connections, and promote walking and cycling, this project will serve as a model for urban development.
This new, mixed-use development puts to use an area of sterile land in the town of Crediton. We contributed to development planning, air quality review, and delivery of the highway works.
We helped Muirhall Energy Ltd plan, assess, and approve the best highway route to move 15 wind turbines to their Crossdykes Wind Farm.