Skip to main content
Start of main content
Search Form Close Button

1631 - 1640 of 2524 results

Filter By

Showing 1631 - 1640 of 2524 results

  • Harlow and Gilston Garden Town Digital Insight Support
    Project

    Harlow and Gilston Garden Town Digital Insight Support

    Harlow and Gilston Garden Town (HGGT) engaged Stantec to help them gain a better understanding of what community members wanted for the future of the town. We also worked the HGGT to improve their overall digital capabilities.

    • Location:
      • Harlow, United Kingdom
    • Services:
      • Digital Services
      • Future Mobility & Smart Cities
    • Markets:
      • Strategic Land & Housing
      • Urban Regeneration
    Project
  • Harrow New Civic Centre
    Project

    Harrow New Civic Centre

    We contributed a full suite of engineering services to the planning application for Harrow’s new civic centre campus.

    • Location:
      • London, United Kingdom
    • Services:
      • Buildings
      • Structural Engineering
    • Markets:
      • Leisure & Hospitality
    Project
  • Hartmoor Substation Feasibility Study
    Project

    Hartmoor Substation Feasibility Study

    National Grid engaged Stantec to investigate options to adapt their existing Hartmoor substation site to accommodate solar generation and connect multiple new customers.

    • Location:
      • Hartlepool, United Kingdom
    • Services:
      • Mechanical & Electrical Engineering
    • Markets:
      • Energy
      • Transmission & Distribution
    Project
  • Hastings Bathing Water Improvement Scheme
    Project

    Hastings Bathing Water Improvement Scheme

    Stantec’s targeted site investigations discovered the root cause of pollution at Hastings Beach and allowed us to design a cost-effective, sustainable solution.

    • Location:
      • East Sussex, United Kingdom
    • Services:
      • Engineering & Technical Services
    • Markets:
      • Wastewater Treatment
      • Water
    Project
  • Heathy Wood and St Modwen Park, Land West of Copthorne
    Project

    Heathy Wood and St Modwen Park, Land West of Copthorne

    We provided planning support and transport infrastructure design to St Modwen’s new, mixed-use development near Copthorne Village.

    • Location:
      • Mid Sussex, UK
    • Services:
      • Civil Engineering Project Management
      • Flood Risk Management & Drainage
      • Planning, Consenting & Approvals
      • Transport Planning Services
      • Urban Drainage & Flooding Engineering Services
    • Markets:
      • Active Travel
      • Bus & Coach
      • Commercial & Industrial
      • Strategic Land & Housing
      • Transport
      • Water Networks
    Project
  • Helpston Landfill Sites - Groundwater Protection Scheme
    Project

    Helpston Landfill Sites - Groundwater Protection Scheme

    We are working with the Environment Agency to contain pollution pathways, prevent further migration of mecoprop contamination, and design and implement source solutions at two Helpston landfill sites

    • Location:
      • Helpston, England
    • Services:
      • Contaminated Land
      • Environmental Consulting
      • Ground Engineering
    • Markets:
      • Water
    Project
  • High Speed Rail 2 (HS2) - Phase 1: AW6 Enabling Works Framework
    Project

    High Speed Rail 2 (HS2) - Phase 1: AW6 Enabling Works Framework

    For phase 1 of the HS2 project, our team is providing full design, environmental and consents support for a major interchange as well as a haul road enabling works package.

    • Location:
      • United Kingdom
    • Services:
      • Engineering & Technical Services
      • Environmental Consulting
      • Regeneration & Renewal
      • Transport Planning Services
    • Markets:
      • Rail & Light Rail
      • Transport
    Project
  • Hinkley Point C - Safety Report
    Project

    Hinkley Point C - Safety Report

    EDF Energy appointed our specialist nuclear management team as the quality and safety report lead for the UK’s first nuclear power station in more than 20 years.

    • Location:
      • Bridgwater, Somerset, England
    • Services:
      • Nuclear Advisory Services
      • Nuclear Technical Services
      • Risk & Review
    • Markets:
      • Energy
      • Nuclear
    Project
  • Hobhole Pumping Station
    Project

    Hobhole Pumping Station

    The Witham Fourth Internal Drainage Board commissioned Stantec to lead the feasibility, outline design, and detailed design stages of this pumping station replacement project.

    • Location:
      • Lincolnshire, United Kingdom
    • Services:
      • Civil Engineering Project Management
      • Flood Risk Management & Drainage
      • Structural Engineering
      • Urban Drainage & Flooding Engineering Services
    • Markets:
      • Climate Solutions
      • Climate Solutions - Environment
      • Water
      • Water Resources
    Project
  • Hollym, Myers Lane Aero-Fac®, Wastewater Treatment Works
    Project

    Hollym, Myers Lane Aero-Fac®, Wastewater Treatment Works

    After collaboration with Yorkshire Water, Gurney Environmental, and Ward and Burke, Stantec worked with Yorkshire Water to develop a new Aero-Fac® Wastewater Treatment Works using renewable energy wind-power to treat wastewater—a low carbon solution.

    • Location:
      • Withernsea, Yorkshire, United Kingdom
    • Services:
      • Water Infrastructure Engineering
    • Markets:
      • Coastal & Marine
      • Nature-based Solutions
      • Wastewater Networks
      • Water
    Project
End of main content
To top