Crossdykes Wind Farm
We helped Muirhall Energy Ltd plan, assess, and approve the best highway route to move 15 wind turbines to their Crossdykes Wind Farm.
1531 - 1540 of 2543 results
Showing 1531 - 1540 of 2543 results
We helped Muirhall Energy Ltd plan, assess, and approve the best highway route to move 15 wind turbines to their Crossdykes Wind Farm.
Stantec’s geohazard specialists deployed our proprietary, agent-based landslide model, DebrisFlow Predictor, to model and delineate potential hazard zones within the site for a client planning to expand their hydro-electric facility on steep slopes.
We provided planning, engineering design, environmental assessment, and public consultation support for an expansion to a hydroelectric facility expansion.
We worked with Cycle Scotland to develop and monitor an award scheme that would encourage school campuses to improve their students’ cycling habits.
We worked with Prologis UK Ltd to design a culvert and flood protections that would improve motorist safety on the A5 and at the Daventry International Rail Freight Termianl (DIRFT).
We provided engineering and sustainability services to support the development of both the Leeds and Manchester hotels on their respective brownfield, city centre sites.
Our civil engineering services helped our client expand facilities hosting Europe’s largest data centre cluster.
Stantec was appointed to provide the structural and civil engineering design for David Russell Hall. The result? A single-storey, steel-framed, masonry-clad building.
Yorkshire Water engaged Stantec to help construct free surface water wetland to treat stormwater overflow discharges with limited use of carbon heavy materials.
Upon completion, this project will free up space on existing lines, provide for new local train services, passengers and freight, and ease congestion and over-crowding.