Stantec is working as lead designers supporting Taziker on behalf of Network Rail to regenerate and prolong the life of Bristol Temple Meads railway station, a Grade I listed building—including reglazing existing rooflights and refurbishing the roof.
Location:
Bristol, United Kingdom
Services:
Structural Engineering
Markets:
Bridges & Infrastructure
Rail & Light Rail
Project
Bristol Water - MCERTS Accreditation
Stantec achieved a rare first round approval of an environmental management system (EMS) for Bristol Water’s water treatment sites—by reviewing procedures and developing an EMS that would meet MCERTS requirements for self-monitoring of flow.
Location:
United Kingdom
Services:
Asset Management
Transformation
Markets:
Wastewater Networks
Wastewater Treatment
Water Networks
Water Resources
Water Treatment
Project
Bristol Zoo
Following the relocation of their zoo in 2022, the Bristol Zoological Society wanted to leave behind an impactful and sustainable contribution to the community—we were there to help.
Location:
Bristol, United Kingdom
Services:
Architecture
Town Planning
Markets:
Community Development
Project
Brooklands Development
Combining award-winning landscape design with our sustainable urban drainage systems (SuDS), we helped the Brooklands development get their infrastructure up and running earlier while also finding cost savings.
Location:
Milton Keynes, United Kingdom
Services:
Regeneration & Renewal
Markets:
Strategic Land & Housing
Transport
Project
Brucejack Mine 138kV Transmission Line
The interconnection of the mine to the municipal grid of Stewart required the construction of 55 km of 138 kV transmission line, including 140 transmission towers, in an area prone to rockfall, landslides, snow avalanches, and channel avulsion.
The Bujagali Hydroelectric facility is located about 8 km downstream of the existing Owen Falls Hydropower Project, which regulates the flows into the Victoria Nile from Lake Victoria and developing a gross head of approximately 22 meters.
Location:
Victoria Nile River, Uganda
Services:
Engineering & Technical Services
Water Infrastructure Engineering
Markets:
Energy
Water
Project
Burnhope Reservoir
By upgrading the Burnhope Reservoir, Esh-Stantec is helping to boost safety and resilience through a valve replacement and innovative cross-connection pipeline that protects customers and provides reliable raw water supply to Wear Valley WTW.
Location:
County Durham, UK
Services:
Civil Engineering Project Management
Engineering & Technical Services
Flood Risk Management & Drainage
Water Infrastructure Engineering
Markets:
Water
Water Resources
Project
Bus Quality Contract Scheme Development
Our Transport Economics team helped transportation provider Nexus prepare a quality contract scheme application to gather evidence and responses to support a significant modification to their bus services.
Location:
North East, United Kingdom
Services:
Infrastructure Planning
Strategy & Planning
Transformation
Transport Planning Services
Markets:
Roads
Transport
Project
Business Case for the Leeds City Region HS2 Growth Strategy
For this project, our job was to develop a business case to ensure the opportunities generated by HS2 are realised—maximising economic growth for the city of Leeds and the wider region.
Location:
Leeds, United Kingdom
Services:
Transport Appraisal & Business Cases
Transport Planning Services
Markets:
Public Sector
Rail & Light Rail
Transport
Project
Buslingthorpe Mills