Bristol Old Vic Refurbishment - Engineering Services
We provided structural, civil, environmental, and ground engineering services for this complex remodelling of a listed theater on a constrained site.
1421 - 1430 of 2504 results
Showing 1421 - 1430 of 2504 results
We provided structural, civil, environmental, and ground engineering services for this complex remodelling of a listed theater on a constrained site.
Stantec is working as lead designers supporting Taziker on behalf of Network Rail to regenerate and prolong the life of Bristol Temple Meads railway station, a Grade I listed building—including reglazing existing rooflights and refurbishing the roof.
Stantec achieved a rare first round approval of an environmental management system (EMS) for Bristol Water’s water treatment sites—by reviewing procedures and developing an EMS that would meet MCERTS requirements for self-monitoring of flow.
Following the relocation of their zoo in 2022, the Bristol Zoological Society wanted to leave behind an impactful and sustainable contribution to the community—we were there to help.
Combining award-winning landscape design with our sustainable urban drainage systems (SuDS), we helped the Brooklands development get their infrastructure up and running earlier while also finding cost savings.
The interconnection of the mine to the municipal grid of Stewart required the construction of 55 km of 138 kV transmission line, including 140 transmission towers, in an area prone to rockfall, landslides, snow avalanches, and channel avulsion.
The Bujagali Hydroelectric facility is located about 8 km downstream of the existing Owen Falls Hydropower Project, which regulates the flows into the Victoria Nile from Lake Victoria and developing a gross head of approximately 22 meters.
By upgrading the Burnhope Reservoir, Esh-Stantec is helping to boost safety and resilience through a valve replacement and innovative cross-connection pipeline that protects customers and provides reliable raw water supply to Wear Valley WTW.
Our Transport Economics team helped transportation provider Nexus prepare a quality contract scheme application to gather evidence and responses to support a significant modification to their bus services.
For this project, our job was to develop a business case to ensure the opportunities generated by HS2 are realised—maximising economic growth for the city of Leeds and the wider region.