Pinner Wood School, London
After a sinkhole revealed unstable ground related to an abandoned chalk mine, we conducted surveys on behalf of Harrow Council and Pinner Wood School to determine the mine’s extent and the effectiveness of safety measures.
1771 - 1780 of 2502 results
Showing 1771 - 1780 of 2502 results
After a sinkhole revealed unstable ground related to an abandoned chalk mine, we conducted surveys on behalf of Harrow Council and Pinner Wood School to determine the mine’s extent and the effectiveness of safety measures.
We provided integrated engineering services for the Plaza Cinema refurbishment, a project which turned a listed building’s iconic façade into the public face of a new sustainable community hub.
The London Borough of Greenwich appointed Stantec as the civil, structural, and mechanical, electrical, and plumbing engineering team for the redevelopment of Plumstead Library. We produced a building information modelling (BIM) Level 2 Revit model.
We helped the Plymouth City Council develop a personalised travel planning system that encouraged community members to use more multi-modal transportation options. The project also resulted in reports of increased activity and health.
Rethinking the operational model for frequent long-distance services, plus offering the front and back of house activities that are needed, we combined the skills of our bus planners and civil engineers for this project.
Delivering a large project in the middle of regeneration zone before further redevelopment provided difficulties in integrating it into both the existing and future networks—we created a travel plan to address these challenges.
We helped Plymouth University overhaul their travel plan to improve sustainable travel between their campuses.
We provided multidisciplinary engineering and sustainability services on this housing development, from initial planning stages on.
The Poole Water Recycling and Transfer Strategic Resource Option seeks to address water resiliency in the South of England. Stantec’s work includes programme support, catchment modelling, regulatory engagement, and a nature-based solution.
From full economic impact assessment to detailed master plan, we helped Scottish Enterprise clarify their vision of the Port of Leith as a renewable energy hub while keeping national economies and local economic growth on track.