2 MW ECM Battery Storage Design Build
Both systems included solar photovoltaic (PV) system installations that were designed to produce excess power for storage in the batteries.
31 - 40 of 4864 results
Showing 31 - 40 of 4864 results
Both systems included solar photovoltaic (PV) system installations that were designed to produce excess power for storage in the batteries.
Parkway Development Corporation engaged Stantec’s Business Advisory Services team to help them attain approval to change zoning for their parcel in Center City.
Working with Harvard Property Management, we helped redesign the 201 Portage Concourse to include a flexible dining area, exciting public space, and modular conference center.
When Transport Scotland needed supporting data for the 2018 tender specification for the Shetland and Orkney ferries, we conducted passenger and stakeholder engagement as well as studied timetable options.
Stantec provided interior design, furniture selection, branding, signage coordination, and engineering basis of design for a media office in Paris for the 2024 Olympics.
Stantec performed a sustainability assessment of credentials before construction began, to satisfy investment mandates for the 203 North Terrace Synergy tower—the Switch—that provides contemporary quality accommodation for university students.
With ADA accessibility top of mind, we’re working in collaboration with the 23-15 44th Drive (Skyline Tower) developer and design team to provide a connection from the New York City Transit station to the new entrance within the building.
Stantec's scope of work included electrical clearances, structural design parameters, and calculation development that would verify vendor calculations for electrical space potential (applied from the transmission circuits to the ADSS line).
Boston Properties (BXP) engaged Stantec to serve as the architect of record for the construction of two new commercial and specialized lab towers in Kendall Square in Cambridge, Massachusetts.
Our team was engaged to develop a transit-oriented development plan for the West 25th Street corridor in Cleveland, Ohio. Our approach included beginning a design that considers multimodal mobility infrastructure needs, safety, and equitable access.